Risk Register
Overview
The Risk Register is a list of the risks and associated measures facing one or more projects. The risks are presented in a table with one row per risk. The rows can be expanded to show tables of the associated measures with one row per measure. Risks and measures can be quickly created.
A Risk Board is mandatory to open a Risk Register. To navigate to one, take one of the following steps:
Go to the project and select the menu item Risk Management in the left panel and select the board by name.
Select the Risks entry in the Jira main navigation bar and select the board by name. If the board’s name does not appear under Recent Boards, then select View All Boards and select the board from that list.
The operations to manage risks in the Risk Register are explained in the table below.
- 1 Overview
- 2 Operations
- 2.1 Display measures associated with a risk
- 2.2 Add a risk
- 2.3 Edit a risk or measure
- 2.4 Add a measure to a risk
- 2.5 Link an existing measure to a risk
- 2.6 Display all risks in the Jira Issue Navigator
- 2.7 Use quick filters
- 2.8 Refresh risks and measures
- 2.9 Export risks to Excel
- 2.10 Select columns of risk and measure tables to display
Operations
Purpose | Action | Note |
---|---|---|
Display measures associated with a risk |
|
|
Add a risk |
| Be sure to create a risk issue and not to inadvertently create an issue of some other type. |
Edit a risk or measure |
|
|
Add a measure to a risk |
| Be sure to create a measure issue and not to inadvertently create an issue of some other type. |
Link an existing measure to a risk |
| The first link type indicated in the selected risk’s project risk scheme will be preselected. Selecting a link type or issue that does not satisfy the corresponding risk scheme and/or board sub-query may result in the linked measure not reflecting in the risk register. |
Display all risks in the Jira Issue Navigator |
|
|
Use quick filters | See Quick Filters. |
|
Refresh risks and measures |
|
|
Export risks to Excel |
| The exported Excel file contains all risks with associated measures collapsed next to them, with the same columns as those displayed in the Risk Register. |
Select columns of risk and measure tables to display |
| Display the link type used to connect a measure issue to a risk issue by selecting the “Link Type“ field. Only fields associated to the board projects' issue type view screen will be displayed in Available fields. |