1.3
Component | Summary |
---|---|
Risk Projects | IMPROVED When navigating to easeRisk via the Jira project sidebar, all boards that include the selected project are displayed. deprecated In favor of boards, project-specific views have been removed. All projects are navigated to the board view for consistency in all around application features. Consequently, general configuration in risk schemes for “Default Columns” for risks and measures have been removed. |
Risk Matrix | new Filter the displayed risks in the risk matrix based on the selected field, order, and number of results provided. new More in-depth inspection of how individual risks evolved over time through an “inline“ comparison which shows arrows that point from the old value to the new value . IMPROVED Risks in the matrix are now painted with its Jira status category color (i.e. Grey = To Do, Blue = In Progress, Green = Done). IMPROVED Risks in the matrix are displayed with its keys (as long as there are less than 3 entries in the same matrix cell). IMPROVED Risk levels can be reordered based on desired hierarchy when adding or editing risk matrices for boards. |
Top Risk History Graph | IMPROVED To add flexibility, rather than a fixed interval, a range may now be configured. Show a range of 3 up to 24 weeks, months, quarters, or years in the graph. |
Risk Register | IMPROVED Use “Show in issue navigator“ for the risks that appear in the risk register, so e.g. bulk edit can be applied to the risks. |