To create a Suspect Report, select Requirements > Suspect Report from the main navigation bar, select the relevant project and the “Go” button. The report is a table with a row for every suspect link. The Search field can be used to search the report for rows containing a given piece of text.
Include links to other projects | Include cross-project links flagged as suspect. |
Period | Restrict to issues with suspect flags created within the specified time period. |
Link type(s) | Restrict to specified link types. The link type name is used to specify the link type (e.g. “trace”), while in the report the link description is used (e.g. “trace to”). The link type name is used to specify the link type (e.g. “trace”), while in the report the link description is used (e.g. “trace to”). |
User | Restrict to changes made by the specified users. |
Changed Issue | The issue whose change triggered a suspect rule. |
Linked Issue | The dependent issue that might be affected by the change. |
Link Type | The link type between the changed issue and the dependent issue. |
User | The user who made the change. |
Suspect Timestamp | The date and time of the change. |
Action | Provides the following actions:
|