Suspect Report
To create a Suspect Report, select Requirements > Suspect Report from the main navigation bar, select the relevant project and the “Go” button. The report is a table with a row for every suspect link. The Search field can be used to search the report for rows containing a given piece of text.
Report Options
Include links to other projects | Include cross-project links flagged as suspect. |
Period | Restrict to issues with suspect flags created within the specified time period. |
Link type(s) | Restrict to specific link types. The link type name, not the link description, is used to specify the link type (e.g. “Trace”, not “trace to”). The report shows the link description from the point of view of the changed issue (e.g. “trace to”). |
User | Restrict to changes made by the specified users. |
Report Columns
Changed Issue | The issue whose change triggered a suspect rule. |
Linked Issue | The dependent issue that might be affected by the change. |
Link Type(s) | The outward description of the link (or links if there are more than one) from the changed issue to the dependent issue. |
User | The user who made the change. |
Suspect Timestamp | The date and time of the change. |
Action | Provides the following actions:
|
How to clear the suspect flag
There are two three ways to clear the suspect flag:
Suspect Report:
In the Report in the Action column of a given requirement, use the option Clear.
In the Report in the first column of a given requirement, tick the checkboxes of suspect links you wish to clear, select the button Clear selected suspect links and select Clear in the dialog to confirm.
Status colour Green title V4.20
Detail view: In the section "Issue Links” in a requirement’s Detail view, use the option Clear.