Suspect Report
To create a Suspect Report, select Requirements > Suspect Report from the main navigation bar, select the relevant project and the “Go” button. The report is a table with a row for every suspect link. The Search field can be used to search the report for rows containing a given piece of text.
Report Options
Include links to other projects | Include cross-project links flagged as suspect. |
Period | Restrict to issues with suspect flags created within the specified time period. |
Link type(s) | Restrict to |
specific link types. The link type name, not the link description, is used to specify the link type (e.g. |
“Trace”, not “trace to”). The report shows the link description from the point of view of the changed issue (e.g. “trace to”). | |
User | Restrict to changes made by the specified users. |
Report Columns
Changed Issue | The issue whose change triggered a suspect rule. |
Linked Issue | The dependent issue that might be affected by the change. |
Link Type(s) | The |
outward description of the link (or links if there are more than one) from the changed issue |
to the dependent issue. | |
User | The user who made the change. |
Suspect Timestamp | The date and time of the change. |
Action | Provides the following actions:
|
How to clear the suspect flag
There are two ways to clear the suspect flag:
Suspect Report: In the Report in the Action column of a given requirement, use the option Clear.
Detail view: In the section "Issue Links” in a requirement’s Detail view, use the option Clear.